Carter Renewables is focused on delivering commercial scale wind, solar, combined heat and power, biomass, hydro and anaerobic digestion projects, and offers advice on all forms of renewable energy generation.
Their extensive experience in managing renewable projects allows them to confidently assist you from project inception through to energy production. Ensuring the most appropriate, efficient and economically viable technology is delivered. They also have expertise in facilitating and managing the key activity of electrical grid connections.
Westmill Wind Farm
Westmill Wind Farm Co-op was the first onshore wind farm to be built in the south-east and is 100% community owned.The wind farm produces more green electricity in a year than is used by 2,500 homes whilst reducing emissions by at least 5,000 tonnes of carbon dioxide a year based on the UK generation mix. Read more »
North Pickenham Wind Farm
North Pickenham wind farm is located four miles from Swaffham on the edge of a locally designated landscape of predominantly arable land, with some woodland areas. The area of land was selected for the wind farm because it had previously been an airfield. Read more »
Wind Turbines, Tesco Magor
R G Carter Civil Engineering were entrusted by Tesco to install two 100 metre tall wind turbines at their Magor distribution depot in South Wales. Read more »