Magor
Introduction:
R G Carter Civil Engineering were entrusted by Tesco to install two 100 metre tall wind turbines at their Magor distribution depot in South Wales.
Details:
- The turbines are capable of generating 1.6 megawatts, enough to power around 600 homes.
- R G Carter handled the design, construction and installation of the balance of plant works with Enercon providing the turbines.
- The distribution centre was open 24 hours a day throughout the works.
- The foundations consisted of square precast concrete piles to 16 metre depth and 2.5 metre thick reinforced in-situ concrete capping.
- Temperatures within the concrete pour reaches 60ºC and has to be monitored closely to prevent thermal cracking within the foundation.
- Thermal blankets insulate the concrete surface to ensure the temperature gradient from the centre to the surface did not exceed 20ºC.