Work on Phase 3 at the housing development at Canary Quay is now reaching its highest point in construction, with the roof now having been poured. Using a light gauge steel panel system, as per used across the whole scheme, this 100% social housing block is 9 storeys at its highest, and 5 floors at the lowest point, for a staggered visual from the front facade.

These 73 one and two bedroom apartments sit directly opposite Phase 2 block finished earlier this year, which fronts the River Wensum in Norwich city centre, and sits adjacent to Norwich City Football Club.