Our Engineering Team is working closely with Integrated Water Services (IWS) to deliver a new water industry site for Essex and Suffolk Water.

The project involves the construction of a 3 x 10 x 2m deep reinforced concrete sump and a steel portal framed building, which will be used for the installation of four pumps and a large surge vessel. This will boost water along a 400dia pumping main, providing resilience to the existing water supply infrastructure.