Hanger Refurbishment – RAF Leeming

The project comprised of the refurbishment to the main hangar roof, side walls and hanger doors.

Works included the removal of the existing roof coverings, walls and doors; design and installation of a new standing seem roof system, composite walling and smoke evacuation roof lights.

The pitch of the roof altered with additional steelwork and a lightweight sliding hangar doors installed. An asset protection fire detection system was also designed and installed.

Client:
Turner Facilities Management
Location:
North Yorkshire
Completion:
2014
Back to Projects